Institutional MEPF Engineering

ARK Engineering

ARK Engineering provides professional, cost-effective MEPF engineering for healthcare, higher education, and institutional clients across Florida. Our team of experienced, licensed professionals is committed to providing the right design the first time through open communication, creative problem solving, and attention to detail.

5

Disciplines In-House

150+

Projects Completed

12

Years in Practice

6

Licensed Engineers

Trusted By

University of FloridaUniversity of MiamiBaptist Health South FloridaMount Sinai Medical CenterJames A. Haley VA HospitalNicklaus Children's HospitalUniversity of Central FloridaFlagler College

Selected Work

Healthcare, campus, research, and infrastructure work across Florida.

Exterior of the Sylvester Cancer Center at dusk.

University of Miami

Chilled water piping replacement supporting an occupied cancer-care campus.

Boiler plant equipment and controls at James A. Haley VA Hospital.

James A. Haley VA Hospital

Boiler plant controls modernization for a mission-critical VA campus.

Exterior equipment serving the University of Miami Knight Physics Lab 123 renovation.

University of Miami

Laboratory renovation for a university physics environment with specialized support systems.

Interior of the Thermacell mosquito breeding research facility.

Thermacell

Facility systems for a dedicated research environment with lab-style support spaces.

Interior view of the Florida Panthers arena.

Florida Panthers Arena

HVAC upgrades within a large-scale arena environment serving public events.

Exterior of the Palms Medical Group renovation in High Springs.

Palms Medical Group

Renovation support for a community medical facility in High Springs.

Air-handling equipment installed at UF Williamson Hall.

University of Florida

Air-handling unit replacement improving campus building performance and maintainability.

Rooftop HVAC equipment serving the FWC Eustis Fisheries Lab renovation.

Florida Fish and Wildlife Conservation Commission

HVAC renovation for a fisheries lab environment with specialized operational needs.

Completed interior of the University of Miami Knight Physics Lab 118 renovation.

University of Miami

Lab renovation for a university physics program with room-level systems coordination.

Interior of the University of Miami Cox Lab 35A renovation.

University of Miami

Targeted laboratory renovation supporting research use within an occupied campus building.

Interior of the UF Southwest Recreation Center weight room expansion.

University of Florida

Building systems support for a recreation center expansion serving student athletics.

Brewing equipment at The Cove Brewery.

The Cove Brewery

Steam boiler work supporting brewery operations and process reliability.

Rendering of the CCA K-2 School Building.

CCA

Systems planning for a K-2 school building with a child-focused campus environment.

Rendering of the Faith Assembly Narcoossee project.

Faith Assembly

Building systems design for a new Narcoossee campus facility.

Rendering of The Rock Church admin building.

The Rock Church

Administrative building design support communicated through an early project rendering.

Detailed Cost EstimatingFeasibility StudiesHVAC AssessmentsUtility AssessmentsLife Cycle Cost AnalysisDetailed Cost EstimatingFeasibility StudiesHVAC AssessmentsUtility AssessmentsLife Cycle Cost AnalysisDetailed Cost EstimatingFeasibility StudiesHVAC AssessmentsUtility AssessmentsLife Cycle Cost AnalysisDetailed Cost EstimatingFeasibility StudiesHVAC AssessmentsUtility AssessmentsLife Cycle Cost AnalysisDetailed Cost EstimatingFeasibility StudiesHVAC AssessmentsUtility AssessmentsLife Cycle Cost Analysis
MechanicalElectricalPlumbingFire ProtectionControlsMechanicalElectricalPlumbingFire ProtectionControlsMechanicalElectricalPlumbingFire ProtectionControlsMechanicalElectricalPlumbingFire ProtectionControlsMechanicalElectricalPlumbingFire ProtectionControls
Construction AdministrationCommissioningBIM/Energy ModelingLEED ConsultationMaster As-built DocumentationConstruction AdministrationCommissioningBIM/Energy ModelingLEED ConsultationMaster As-built DocumentationConstruction AdministrationCommissioningBIM/Energy ModelingLEED ConsultationMaster As-built DocumentationConstruction AdministrationCommissioningBIM/Energy ModelingLEED ConsultationMaster As-built DocumentationConstruction AdministrationCommissioningBIM/Energy ModelingLEED ConsultationMaster As-built Documentation

Our Team

Senior engineers on every project, not just the proposal.

Anthony Harel-Canada

Anthony Harel-Canada

Principal | Mechanical Engineer

Mr. Harel-Canada is a principal mechanical engineer at Ark Engineering LLC. His career has primarily involved HVAC, plumbing, and fire protection design for healthcare, higher education/research facilities, and central energy plants. The focus on each of his design projects is to determine innovative, energy-efficient solutions that fit the project budget, especially for retrofits or renovations. His past projects have ranged in size from $40,000 to $40 million in total construction cost with a wide range of clients including Mount Sinai Medical Center, Baptist Health South Florida, West Palm Beach VA Medical Center, University of Miami, University of Central Florida, and University of Florida.

Client Feedback

What our clients say.

ARK's team brought a level of technical rigor and responsiveness we don't often see. They understood our operational constraints from day one.

Client Name

Director of Facilities, Regional Medical Center

Working with ARK felt like having an extension of our own engineering staff. Principal-level attention on every call, every submittal review.

Client Name

Project Manager, State University System

They delivered a commissioning package that exceeded our expectations and caught issues the contractor missed. We've used them on three projects since.

Client Name

Senior Project Manager, General Contractor

Get in Touch

Let's talk about your next project.

Whether you need full MEPF design, commissioning support, or a feasibility study — we'd like to hear about it.

Start a Conversation

Email

admin@ark-engineers.com

Phone

352.559.2654

Office

2731 NW 41 ST Suite B-2
Gainesville, FL 32606

© 2026 ARK Engineering LLC
Gainesville, FLFL License ME30873